Knowing the stages of a full repaint lets you read a quote against them. South Jordan House Painters, a referral service, connects homeowners with licensed local painting contractors who do this work.
What counts as a full repaint?
The whole outside of the house: wall surfaces, trim, soffits, fascia, doors and the garage door. A painting contractor walks the house, measures the paintable area and notes the siding type, the number of stories and the condition of the old paint. Price follows area, siding and height, which the cost page breaks out.
In Daybreak, a house paint color change needs Design Review approval before any paint goes on, and in a sub-association it is not approved until both the sub-association and the master association have approved it (Daybreak design review). Daybreak can say whether a same-color repaint needs an application too. See Daybreak color approval.
What happens before any paint goes on?
Prep decides how long the job lasts. Sherwin-Williams says up to 80% of all coating failures can be directly attributed to inadequate surface preparation (Sherwin-Williams). A full prep runs through these steps in this order, so ask the quote to say how each one is handled:
- The house is washed, by pressure or by hand, to remove dirt, mildew and loose paint, then left to dry. The same company says to allow at least 24 to 48 hours for it to dry (Sherwin-Williams).
- Loose paint is scraped and the edges are sanded smooth. Glossy old paint is dulled so the new coat can grip.
- Rotten trim and split boards are repaired or replaced. A painter is not a carpenter, so ask who does wood repair and how it is priced.
- Failed caulk is replaced. Sherwin-Williams says to dig out caulk that is cracking or pulling away and to caulk butt joints, but not the lap joints of siding, because those let moisture out from behind the wood (Sherwin-Williams).
- Bare wood, brick or stucco is primed to improve adhesion.
When in the year can exterior paint go on?
When the weather allows it. The limits Sherwin-Williams publishes show what that means.
| Condition | What Sherwin-Williams says |
|---|---|
| Normal air temperature | Avoid painting below 50°F or above 90°F |
| Some exterior product lines | Can go on down to 35°F |
| After painting | Ideally stay in the product's range and above the dew point for at least 48 hours, or the paint's life is shortened |
| Before rain | Typically needs at least 24 hours to fully cure |
| After heavy rain | Wait a minimum of one day, and the surface must be dry |
Sources: general guidance and product application FAQ. These are one manufacturer's guidelines, so ask the contractor which product's limits apply to your job.
Dew matters as much as the daytime high. The same FAQ warns that dew forms as soon as the sun goes down and can get into uncured paint, causing staining and adhesion problems even when the afternoon was warm enough. So the overnight low counts, especially at either end of the season.
A contractor who knows the week's forecast is the person to ask which days work, and a careful one waits for the morning dew to go and follows the shade around the house.
What about the sun?
Today's Homeowner calls the sun's UV rays the greatest threat to a paint job, with prolonged exposure leading to fading (Today's Homeowner).
Ask a contractor how sun-facing walls on your house are holding up and whether the product being proposed suits them.
How many coats, and what sheen?
Sherwin-Williams recommends two coats for best results. Trim and doors usually go first, then the walls from the top down. Large walls may be sprayed and back-rolled; narrow lap siding is often brushed. Satin or semi-gloss works best on trim and doors, while flat finishes can be used on large wall surfaces (Sherwin-Williams). Masking and drop cloths protect windows, roofing, lights and plants.
How long should the new paint last?
Sherwin-Williams says exterior paint may last 7 to 10 years depending on climate, surface material and paint quality. Daybreak tells homeowners to plan to repaint every 7 to 10 years and notes that dark or especially bright colors may fade faster (Daybreak design review). Wood siding may need repainting every three to seven years (Nationwide). The siding page compares materials.
What should happen at the end?
A walk-through with the crew lead, where you mark misses, drips, thin spots and overspray. Leftover paint should be labeled with color and product for touch-ups.
Common questions
Does the house need lead-safe work?
If it was built before 1978, anyone paid to disturb its paint must be certified, whoever repairs painted trim included. Minor work that disturbs 20 square feet or less of exterior paint (six square feet or less per room inside) is not covered, but window replacement and demolition of painted surfaces are always covered. See lead-safe painting and the rules and approvals page.
Can paint go on right after a wash?
Not until the house has dried, which per the guidance above means at least 24 to 48 hours.
Why does paint peel?
Causes include moisture behind the paint, painting over dirt, chalk or gloss, and cold nights or dew on fresh paint. A coating that traps moisture will blister and peel.
To start a repaint, call (385) 855-2723 or use the contact page.